Skip to Content
// Migrations

Your pipelines.
Better infrastructure.
Minimal rewrite.

Most ETL migrations fail not because of technical complexity, but because teams have to rebuild everything from scratch. We've found a better way — one that preserves what you've built and modernises the infrastructure around it.

Clients migrated from PDI, Talend, and Informatica
Automated converters for PDI, Talend, Informatica, and SSIS
Open source foundation — no new vendor lock-in
// Migration paths

Where are you coming from?

Every migration is different. Some benefit from automation, some need hands-on delivery — most need both. We've done all three, and we scope to what your project actually requires. New to Apache Hop? See how it compares to other ETL tools.

From Talend
Talend's licensing model has changed. Your migration window is now
Converter in preview
Converts jobs, joblets, tMap, file and database components into native Hop pipelines and workflows
Contexts become Hop environments; repository connections become shared Hop connections
Embedded Java is flagged, never guessed — the report lists exactly what needs a person
Delivered as a scoped engagement: audit, conversion, and parallel validation — so you cut over with confidence
From Informatica
Enterprise-grade migration — without the enterprise licence cost on the other side
Converter in preview
Converts PowerCenter mappings and IICS tasks into Hop pipelines, translating the expressions
Expressions are translated; anything unrecognised is kept as a Formula and flagged, never dropped
Clients have eliminated Informatica licence costs — preserving the logic, not the bill
We handle the hard parts: complex lookups, joiner transformations, session configs, and parameter files
From SSIS
SQL Server Integration Services, without the Microsoft-only runtime
Converter in preview
Converts .dtsx packages: control flows into Hop workflows, Data Flow Tasks into pipelines
SSIS expressions are translated with SSIS's own rules for NULLs, casts and functions
Checked against SSIS itself: sample projects load the same tables in SSIS and, converted, in Hop
Script Tasks and Script Components are flagged, with their code kept — the report lists exactly what needs a person
// How it works

Migration, not reconstruction

The logic you've built over years has value. We translate it — automatically where we can, carefully where we can't — so the result runs better without starting over.

1
Audit
We catalogue every pipeline, connection, and schedule. Complexity is surfaced before scoping — no surprises after the contract is signed.
The migration docs →
2
Convert
Automated where tooling exists, manual where it doesn't. Either way, the output is working Apache Hop pipelines — reviewed by the team before handover.
How the importers work →
3
Validate
Migrated pipelines run alongside the source system. Row-by-row output comparison means you cut over on evidence, not faith.
Validate a migration →
4
Cut over
When validation is complete, we cut over. Full documentation, knowledge transfer, and a team that actually knows how the pipelines work.

We've done this before

Customers have migrated from all three platforms to Putki. We don't oversell the automation — every conversion comes with a report of what still needs a person. What we do guarantee is that someone on our team has done this migration before, on a real project, for a real client.

Talk to us
// Common questions

Things people ask

How much of a PDI project does the converter handle automatically?
The large majority of standard steps — Table Input, Table Output, Stream Lookup, Sort Rows, Filter Rows, and most others — become native Hop transforms: the conversion is Apache Hop's own Kettle import. Code that still calls the Pentaho API, steps Hop has no plugin for, and connection passwords are flagged in the migration report, and the pre-migration audit lists what the import leaves out, such as log tables and clustering. You see both before we start delivery, not after. Run them on PDI's own samples in Get started with the PDI importer.
How much of a Talend, Informatica or SSIS project converts automatically?
It depends on your project, which is why we don't quote a single rate. Jobs built from standard components — database and file I/O, tMap, lookups, joins, aggregations — convert almost entirely. Embedded Java (tJava) can't be translated reliably by any tool, and neither can the C# of SSIS Script Tasks. On the Informatica side, PowerCenter workflows, with their session commands and emails, are still rebuilt by hand. The converters are in preview. Every run produces a report that classifies each component as automatic, flagged for review, or manual, with the reason. Send us an export and you'll see the figure for your own project before you commit to anything.
Are the converters open source?
They're about to be. The Talend, Informatica, SSIS and PDI importers are being released under the Apache 2.0 licence through the Apache Hop marketplace, for use in the Hop GUI and with hop-import; they need Apache Hop 2.20.0. For PDI, the conversion itself is already open source: it is Apache Hop's own Kettle import, and our importer adds the migration report and the audit. After the release, you can run them yourself at any time, with the documentation that is already online. Until then, we run them for you as part of the audit. Our engagement covers what the converter can't do on its own: the manual work, the review, and the validation.
Do we have to use Putki, or can we use open source Apache Hop?
The migrated pipelines run on Apache Hop — open source, yours to keep. Putki layers production operations on top: scheduling, monitoring, CVE patching, and a plugin ecosystem. You decide how much of that you want. There's no minimum.
How long does a migration take?
Honestly, it depends on what you're migrating from and how much of it. A 50–100 pipeline PDI project with the converter typically lands in a few weeks including validation. A large Informatica environment is a longer conversation. We scope after the audit — so the estimate you get is based on what we actually found, not a range designed to cover every eventuality.
What about our existing schedules and orchestration?
Schedules, dependencies, triggers, and error handling all migrate to Apache Hop workflows and the Putki scheduler as part of the engagement. The Talend converter carries over job-level orchestration; PowerCenter workflows are rebuilt as Hop workflows by hand. Schedules from your old scheduler are rebuilt by our team, not read automatically. Either way, the operational behaviour comes with the pipelines — we don't deliver logic that runs but nothing that runs it.

Start with the audit

Tell us what platform you're on, or send us an export. We'll run it through the converter and come back with a realistic scope: what converts, what needs manual work, and what it costs.

Not ready to migrate yet?

Get your team up to speed on Apache Hop before the migration starts — so the handover actually sticks.